Submitted by admin on Sat, 12/05/2015 - 09:06 Plan number and title Plan date Status EARTHWORKS P1.ENG040 Earthworks north 2016-01-28 APPROVED 2016-02-19 P1.ENG041 Earthworks south 2016-01-28 APPROVED 2016-02-19 P1.ENG043 Earthworks volumes 2016-01-28 APPROVED 2016-02-19 P1.ENG044 Silt management 2016-01-27 APPROVED 2016-02-19 P1.ENG045 DANGER Existing services 2016-01-26 For information ROADING AND SERVICES PLAN SET (includes A3 format versions of pages below) 2017-11-06 APPROVED 2018-02-20 ROADING P1.ENG001 Road layout north 2017-11-02 APPROVED 2018-02-20 P1.ENG002 Road layout south 2017-09-20 APPROVED 2018-02-20 P1.ENG003 Road long sections 2017-10-29 APPROVED 2018-02-20 P1.ENG004 Road cross sections 2017-10-04 APPROVED 2018-02-20 P1.ENG005 Road construction details pipeline crossings 2017-10-04 APPROVED 2018-02-20 Concrete pavement design option using SSF47 fibre reinforcing: PS1 certification 2017-11-04 FINAL Concrete pavement design option using steel fibre reinforcing READYFloor product certification FINAL Bridge slab and concrete roading pavement design PS1 - Airey Consultants 2016-02-16 FINAL SEWER P1.ENG010A Sewer layout North (approved November 2016 for early directional drilling under GWRC water pipeline) 2016-09-07 APRROVED 2016-11-01 P1.ENG010A.1 Sewer layout North: Revision 1 2017-10-30 APPROVED 2018-02-20 P1.ENG011A Sewer Layout South 2017-10-30 APPROVED 2018-02-20 P1.ENG012 Sewer long sections (approved November 2016 for early directional drilling under GWRC water pipeline) 2017-09-07 APPROVED 2016-11-01 P1.ENG012A.1 Sewer long sections: Revision 1 2017-10-30 APPROVED 2018-02-20 P1.ENG016 Sewer and Storm water construction details (Regional Specs Sept2015 DR01 DR02 DR03) 2016-09-06 FINAL STORMWATER P1.ENG014 Stormwater catchments 2017-11-02 APPROVED 2018-02-20 P1.ENG015 Storm water detention calculations 2017-12-04 APPROVED 2018-02-20 P1.ENG010B Storm water layout North 2017-10-29 APPROVED 2018-02-20 P1.ENG012B Storm water Long sections 2017-10-29 APPROVED 2018-02-20 WATER (other than reservoir design) P1.ENG021 Water layout north 2017-11-02 APPROVED 2018-02-20 P1.ENG022 Water layout south 2017-11-02 APPROVED 2018-02-20 P1.ENG023 Water construction details WATER RESERVOIR Geotechnical recommendations and water reservoir platform assessment Final Geotechnical calcs for water reservoir platform Final P1.ENG030 Water tank layout 2016-04-01 Being updated Ross Tanks: Tank design 2015-12-16 For WW review Ross Tanks: Tank design producer statement PS1 2015-12-16 Final Ross Tanks: Tank design calcs 2015-12-16 Final Ross Tanks: Tank design review PS2 2015-11-27 Final P1.ENG031 Tank pipework 2016-04-01 For review P1.ENG032 Control hut and waterworks Being updated Exploration Heights Waterworks electrical 213F_E2-01a Final Exploration Heights Waterworks electrical 213F_E2-02a1 Final Exploration Heights Waterworks electrical 213F_E2-03a Final ADDITIONAL RESOURCES Topo survey results in dwg format Design contours in dxf format (very rough export from QGIS for CAD users) Lot 10 Retaining wall design calcs and PS1 Large single PDF with main plan set collated for easy printing 2017-11-06 Log in to post comments